Skip to main content

The Short Answer

Three things drive most of the cost.

Biggest Driver

Shoot days

Every day on set means crew, gear, locations and talent. One day vs. three changes everything.

Second

Crew + production value

A run-and-gun crew of two and a cinema crew of twelve are different budgets on purpose.

Third

Post-production

Editing, color, sound, motion graphics, versions and review rounds after the cameras stop.

What actually drives the cost of a video?

No two projects are priced the same way because no two projects are built the same way. A 60-second social spot shot in our Waltham studio and a three-day broadcast commercial on location in Boston are both "a video," but they share almost nothing on a budget sheet. Every estimate we write is built from the same ingredients:

  • Pre-production: strategy, concept, scripting, storyboards, scouting and scheduling
  • Shoot days: how many, how long, and how many setups per day
  • Crew: how many people, and which specialists the project needs
  • Locations + studio: where you shoot, permits, and set dressing
  • Talent: on-camera hosts, actors, voiceover and usage rights
  • Gear + production design: cameras, lighting, audio, LED wall, set builds
  • Post-production: editing, color, sound, music, motion graphics and animation
  • Deliverables: how many videos, cutdowns, aspect ratios, captions and languages
  • Reviews + approvals: how many rounds, and who has to sign off
  • Timeline + travel: rush schedules and shoots outside Greater Boston

How does pre-production affect the budget?

Pre-production is the cheapest place to solve problems and the most expensive place to skip. It covers discovery calls, creative concepts, scriptwriting, storyboards or shot lists, location scouting, casting, scheduling and logistics. A straightforward interview video needs a little of this. A commercial with a story, actors and multiple locations needs a lot of it.

The upside: the more we plan, the fewer surprises on shoot day, and shoot days are where budgets usually get away from people.

Why do shoot days matter so much?

The number of shoot days is the single biggest lever on cost. Each day carries crew, equipment, locations, talent, meals and travel. A second day doesn't just add camera time; it adds all of it again.

What fits in a day depends on setups: every time we move the camera to a new location, room or lighting scene, the crew resets. Four interviews in one conference room fit comfortably in a day. Four interviews in four buildings, plus b-roll across a campus, might not. We plan setups carefully so you get the most out of every day you pay for.

How does crew size change the price?

Crew scales with ambition. A lean crew might be a director-shooter and a sound tech. A larger production adds a producer, director of photography, camera operators, gaffer and grips, a production designer, hair and makeup, a teleprompter operator, and a production assistant or two.

More people isn't automatically better. It's about matching the crew to the look and the logistics. A documentary-style shoot inside a working lab calls for a small, quiet team. A broadcast commercial with lighting changes and a big set needs hands on deck.

Do locations, permits and studio time add cost?

They can. Shooting in your own office is usually the simplest option. Rented locations, location fees, permits for public spaces in Boston or Cambridge, parking, police details, and insurance requirements all add line items. Studio time is another option. Our Waltham studio is often the most efficient choice for interviews, headshots, product work and green screen, because everything is already set up.

What about actors, hosts and voiceover?

If your own team is on camera, talent cost is zero (though we'll coach them so they look great). Professional actors, hosts, models and voiceover artists add day rates and, depending on how the video is used, usage fees. Union talent, broadcast usage and longer usage terms cost more than non-union talent used online for a year. We'll walk you through the options before anything is booked.

Does equipment and production design change the price?

Cinema cameras, specialty lenses, lighting packages, drones, gimbals, teleprompters and multi-camera setups each add cost when a project calls for them. Production design (props, wardrobe, set dressing, custom builds) can range from a few well-chosen props to a full set.

Virtual production is a good example of spending to save. An LED wall setup can replace five or six physical locations with one stage, which often lowers the total cost of a multi-location shoot.

How much does post-production add?

Post is where footage becomes a story, and it's often half the work. Budget depends on:

  • Edit length and complexity: a single interview cut vs. a multi-story brand film
  • Color grading and sound design: polish that makes a video feel premium
  • Music: stock licensing vs. custom-composed scores
  • Motion graphics and animation: from simple titles to fully animated explainers, often the biggest post variable
  • Captions, subtitles and translations: per version and per language

Why do the number of versions and deliverables matter?

One master video is one thing. A launch campaign usually needs the master plus 30-, 15- and 6-second cutdowns, vertical and square versions for social, captioned versions, and maybe a few photos for the press kit. Each deliverable is extra editing time. The good news: when we plan for them up front, we shoot with every format in mind, which costs far less than re-cutting later.

How do review rounds and approvals affect cost?

Every estimate includes a set number of review rounds. Projects with many stakeholders, or regulated industries where medical, legal and regulatory teams must sign off, often need more. That's normal, and we plan for it. For our life sciences clients, we build review time into the schedule from day one so approvals don't derail the timeline. Unplanned rounds, late script changes and re-shoots are what push a budget past its plan.

Does a rush timeline cost more?

Usually, yes. A typical corporate video takes three to six weeks from kickoff to delivery, and larger brand films or campaigns take eight to twelve. Compressing that means more people working in parallel, overtime in the edit, and less flexibility on crew and locations. Tell us your deadline up front and we'll tell you honestly what's achievable.

Do you charge for travel outside Boston?

Shoots around Greater Boston, from Cambridge to the South Shore, are our home turf. We travel nationwide too. Projects outside the area add travel days, transportation, lodging and per diems, and sometimes local crew to keep costs down.

What drives the cost of event video and livestreaming?

Events have their own ingredients. The biggest are the number of cameras and operators, the number of rooms or stages, and the length of the program. Livestreaming adds technical direction, switching, graphics and lower thirds, streaming platform setup, redundant internet, and on-site audio coordination with the venue. Same-day highlight reels, IMAG (live screens in the room), and hybrid audiences each add more. A single-camera recording of a talk and a multi-room conference broadcast are very different budgets. See our event + livestream production work.

What drives the cost of photography?

Photography is where many projects start, with a half-day session beginning around $1,500. From there, the drivers are hours on site, the number of setups or locations, how many people are being photographed (a team headshot day for 80 people is different from five executive portraits), the level of retouching, and usage. Adding a photo session to a video shoot that's already happening is one of the most efficient ways to stretch a budget. See our Boston photography.

How can I get more out of my video budget?

  • Batch your content. One well-planned shoot can feed a year of content. For Takeda, we turned a campus into seven studios and captured 80+ assets in two days.
    See the case study.
  • Plan every format up front. Cutdowns and social versions cost less when they're shot for, not salvaged.
  • Add photos to video days. Same crew, same location, two kinds of assets.
  • Use our studio. Fewer company moves, faster setups, more done per day.
  • Lock the script before the shoot. Changes on set and in post are the most expensive kind.
  • Tell us your number. We'll design the project around it instead of trimming a bigger plan down.

How do I get an accurate estimate?

Send us whatever you have: a full brief or a napkin sketch. The most useful details are what the video is for and who will watch it, how many videos and versions you need, where you'd like to shoot, your deadline, and a rough budget range if you have one. We'll come back with a detailed scope and estimate, with no cost and no obligation. Not sure where to start? Book a free 20-minute call or read our video production FAQ.

Have a budget in mind? Tell us the number. We'll tell you what's possible.